Bathroom for
the Eastern Side of the Knight Homestead

Back | Home | Next


north patio entrance | east porch | kitchen | west porch | west patio | living room | bathroom | furnace room | chapel

Full Floor Plan of Western Side of Knight Homestead
dimensions and comments

The bathroom poses problems. Back in about 91 or so a leak formed in pipes that were hidden in a wall area. That resulted in a rotting away of boards by the toilet. Also the tub does not have a good trap.

I had removed a wall to put a shower in for my father, but it did not get financed before he died. That would be nice to finish, but right now I can live with a metal cabinet in that area for towels, etc. and a bookcase on the other side.

The water and toilet need to be repaired and the tub resurfaced. I like the old cast-iorn tubs as they retain the heat better and soaking in a war bath is so necessary with the injured back I need to live with. We intend to dig out more dirt under this area as well as the living room and chapel/bedroom and so wires and piping will be able to go under the flooring.



Descriptions of this area

Area
Comments
Length
Width
Height
 
Room/space              
Door              
Window              

Concise Comments about challenges in this area.

Problems
Comments
¿
     
     
     
     

 

If you would like to help in some way, contact Charlie Knight
by way of e-mail at Cknight4u@aol.com or write him at
The Knight Homestead, 189 Knight Road, New Marlborough (Gt. Barrington PO), MA 01230